Building Permit
ACQUIRE YOUR PERMIT, BUILD YOUR DREAM HOME
REQUIREMENTS
The Prospective Developer must have the following:
Please Note
You may have to provide the following reports if your development is a multi-storey structure or complex: Environmental Impact Assessment Report, Structural Report, Fire Service report, Hydro Report, geological Report or Traffic Management Report.
- Submit completed forms with all other requirements as specified in the Building Permit Application and TCP 1 Forms to the officer in charge at the Development control office Room 47.
- On submission, applicant is informed of corrections to be made or additions if any; the processing fee and date for inspection of site (if necessary).
- Team of officers from Physical Planning and Works Departments inspects the site with the Developer within two (2) weeks of receipt of application to confirm the site as shown on the Site Plan and its suitability for the proposed development.
- The Statutory Planning Committee Secretary (Metropolitan Physical Planning Officer) process the application within two (2) weeks after inspection of site.
- Technical Committee meets to evaluate the application, visits site and makes recommendation to the Statutory Planning Committee (SPC) within four (4) weeks after inspection of site.
- Statutory Planning Committee considers the Development Applications within fourteen (14) working days after the Technical Committee meeting.
- The Statutory Planning Committee Secretary submits approved plans to the Metro Works Department for issuing of development permit within five (5) working days.
- Receipt issued as payment for processing fee is NOT a Building Permit.
- Permit can be obtained within the stipulated three (3) month subject to proper title to land and standard drawings,
- Development must conform to the approved Planning Scheme.
- Fees charge are subject to change and regulated by Fee Fixing Resolution adopted by the General Assembly annually.
- Do not make any false declaration on your application else your application shall be rejected.
We Always Deliver
Meet The Team
Mr. Akasir J. Atibila is the Head of Physical Planning. He leads the department in managing land use, zoning regulations, and urban development strategies to build sustainable local communities. Contact: 0246978234
Get testimonial widget now for Elementor along with a fully responsive & mobile friendly interface to help you manage your client testimonials
To begin the web design journey, visit our "Get Started" page and fill out the brief questionnaire. Our team will then reach out to discuss your vision, goals, and specific design requirements.
Project timelines vary based on the complexity and scope of the design. On average, a standard website design takes approximately 4-6 weeks. For a more accurate estimate, contact our team with details about your project.
Absolutely! We offer website redesign services to enhance the visual appeal, functionality, and overall user experience of your existing site. Connect with us, and we'll discuss the possibilities for your redesign.
We can accommodate both scenarios. If you have content ready, we'll integrate it seamlessly into the design. If not, our team provides professional copywriting services to ensure your website communicates effectively with your audience.
Yes, all our websites are designed to be responsive, ensuring a seamless experience across various devices. Additionally, we implement best practices for search engine optimization (SEO) to enhance your site's visibility online.